From December 8 to 12, 2008 the Ninth
Sino-Russia Fast Reactor Coordination Meeting
was held which was co-presided by LUO Changsen,
Chairman of the Chinese side of the meeting and
director of International Cooperation
Department, CNNC and
Mr.
Ванюков,
Chairman of the Russia side and
director of the Innovation and Technological
Policy Department, Atom EnergoProm of
Russia (AEP). Twelve representatives from Russia
National Atomic Energy Group and AEP and twelve
chinese representatives from CNNC, CIAE and
China Nuclear Energy Industry Corporation
(CNEIC) attended the meeting.
At the
meeting, the two sides reported respectively
information of the 12th conference of
the Sino-Russia subcommittee on nuclear issues,
condition of the Russia BN-800 construction, the
China experimental fast reactor engineering
construction progress, enforcement of the
memorandum of the eighth fast reactor
coordination meeting, as well as enforcement of
the Sino-Russia fast reactor cooperation
contract. Besides, the two sides discussed on
problems emerged in installation and
commissioning of the supplied equipment,
cooperative plan of 2009, Russia commissioning Consulting organization and
the issue of fuel procurement for China experimental fast reactor.
Memorandum of the Ninth Sino-Russia fast
reactor coordination meeting was signed.